Room refurbishment
Elite refurbishes hotel rooms by making the most of what is there
Elite Smart Build renews hotel rooms by resurfacing the furniture, doors and walls already in place instead of throwing them out. That is how it refurbished, for example, the 752 rooms of Barceló Lanzarote Active Resort between 2021 and 2022.

What changes
In a room Elite usually works on the wardrobes, doors, headboards, walls and bathroom. Depending on the hotel, it adds new furnishings or lighting.
Elite puts it down to its expertise in resurfacing, which makes contract refurbishments more efficient and lets the hotel keep its existing furniture.


Projects in figures
Hotels where Elite refurbished the rooms, and what it did in each one.

Barceló Lanzarote Active Resort & Royal Level
All 752 rooms, Royal Level included, plus the spiral staircases and the lift clad in iNfeel.

NH Madrid Barajas
Doors, wardrobes and desks resurfaced, and the washbasin units too, because the film is water resistant.

Radisson Blu Tromsø
Wardrobes, doors, headboards, walls and bathrooms, by the Arctic Circle.

Occidental Alicante
Designed by Elite, with a new colour palette, new lighting and custom murals in the showers.

Hesperia A Coruña
iNfeel on walls, headboards and doors, with the Tower of Hercules as a motif.

Hotel Indigo Brussels
iNfeel on headboards and bathrooms, a short walk from the Grand Place.

Park Inn by Radisson Hotel Heathrow
Paint and iNfeel surfaces.
The pilot room
Before refurbishing the whole hotel, Elite fits out a pilot room with the final finishes. The hotel reviews it and signs it off, and the fixed budget and schedule are set from it.
Questions
All questions- Can hotel rooms be refurbished while keeping the existing furniture?
- Yes. Elite resurfaces the furniture the hotel already has, reusing the existing furniture (FF&E) instead of replacing it. At NH Madrid Barajas it resurfaced the doors, wardrobes, desks and even the washbasin units of 172 rooms. See NH Barajas
- What is a pilot room?
- It is one room finished to the final specification before the rest of the work starts. The hotel reviews it and signs it off, and the fixed budget and schedule are set from it. It is the second phase of Elite's method. How Elite works
- How is the refurbishment schedule agreed?
- Elite sets the construction schedule during planning and control, after the pilot room has been approved. Room types and the fixed budget are also agreed at this stage. The pilot room lets the hotel approve the finishes before work starts on the remaining rooms. How Elite works
- Who installs iNfeel in hotels?
- Elite Smart Build installs it with its own team of installers, set up in 2016. It has used it at NH Madrid Chamberí, Park Inn by Radisson Heathrow and on the staircases of Barceló Lanzarote, among others. See iNfeel
Request a visit
How many rooms does your hotel have?
We'll come and see it, then tell you what we would do.