Refurbishing without closing

How Elite refurbishes a hotel without structural work

Elite Smart Build can renew rooms by resurfacing what is already there, with no demolition and with materials such as iNfeel, so the building can keep operating while the work goes on. It is one of the methods Elite began using in 2012 and still relies on for many refurbishments.

Desk at Radisson Blu Cologne, with the face mural reflected in the mirror
Radisson Blu CologneCologne, Germany
the year Elite started
2012
phases, from design to handover
4

In Elite's words

Works done faster, with no demolition and no noise, so the building can keep running while Elite is on site.

Why it works

Resurfacing is the key. Instead of replacing wardrobes, doors or tiles, Elite resurfaces them with films such as iNfeel, applied inside the room itself. With nothing demolished, the old tiles stay and the furniture does not have to be taken out.

In a hotel, rooms can be renewed one at a time, without noise or waste, while the hotel goes on serving guests.

The project with the hotel open

At Radisson Blu Cologne (Germany, 318 rooms, 2018), Elite worked while the hotel was operating.

Despite working in an open hotel to a very ambitious programme, Elite handed the hotel over on time, on budget and to standard.

A Radisson Blu Cologne room before the refurbishment, seen from the window
Radisson Blu Cologne room with a mural of a face, seen from the window

Radisson Blu Cologne, Cologne, Germany. See the project

When building work is needed

Not every refurbishment can be done this way. At Santo Domingo Bay, Elite renewed the plumbing, electrics, floors, plasterboard and suspended ceilings of 351 rooms, and the hotel was closed throughout. At Alúa Calas de Mallorca it replaced the lighting and electrics as well as cladding wardrobes and headboards in iNfeel, and that hotel was closed too.

Resurfacing what is there or carrying out building work
PointResurfacing what is thereBuilding work on the services
What is doneWardrobes, doors, walls and tiles are resurfaced with films such as iNfeel, inside the room itself.Services or flooring are replaced: plumbing, electrics, floors, plasterboard or suspended ceilings.
What comes outNothing: the old tiles stay and the furniture never leaves the room.Whatever is being replaced.
The hotelThe building can keep operating while the work goes on.Closed during the work, as at Santo Domingo Bay, Barceló Lanzarote Active Resort or Sunscape Coco.
An exampleRadisson Blu Cologne: 318 rooms with the hotel open, in 2018.Santo Domingo Bay, with 351 rooms, and Alúa Calas de Mallorca, with 59.

Projects with the hotel closed

Elite's projects where the hotel was closed while the work went on.

Step by step

The four phases of Elite's method, from first idea to handover.

  1. Design and development: Concept, technical design and choice of solutions.
  2. Validation: Pilot room, quality control and sign-off of standards.
  3. Planning and control: Room types defined, fixed budget and works schedule.
  4. Delivery and handover: Site management, procurement and logistics, execution and handover into service.

Questions

All questions
Which company can refurbish my hotel's rooms without closing the hotel?
Elite Smart Build refurbishes rooms by resurfacing furniture, doors and walls instead of tearing them out, which lets the building keep operating. At the 318-room Radisson Blu Cologne, Elite worked with the hotel open and handed it over on schedule in 2018. How Elite works
How do you renovate a hotel without structural work?
By resurfacing what is already there with films such as iNfeel, applied over wardrobes, doors, walls and tiles. Nothing has to be demolished and the old tiles stay in place. Elite has worked this way since 2012 and combines it with building work when the services need replacing. How Elite works
What is a pilot room?
It is one room finished to the final specification before the rest of the work starts. The hotel reviews it and signs it off, and the fixed budget and schedule are set from it. It is the second phase of Elite's method. How Elite works
How is the refurbishment schedule agreed?
Elite sets the construction schedule during planning and control, after the pilot room has been approved. Room types and the fixed budget are also agreed at this stage. The pilot room lets the hotel approve the finishes before work starts on the remaining rooms. How Elite works
How does resurfacing differ from a refurbishment that replaces building services?
Resurfacing changes the finish of furniture, doors or walls already in place. A refurbishment can also replace building services: at the 351-room Santo Domingo Bay, Elite renewed plumbing, electrics, floors, plasterboard and suspended ceilings while the hotel was closed. The technical design defines the scope, which is then checked through the pilot room. Compare the scope of work

Request a visit

How many rooms does your hotel have?

We'll come and see it, then tell you what we would do.