Skip to content

Spain

Elite Smart Build refurbished Compostela Suites

Living room of a Compostela Suites suite with a green sofa and dining table

In 2020 and 2022 Elite Smart Build refurbished the 296 rooms at Compostela Suites (Spain).

  • 296rooms
  • 2020 and 2022Works

Scope

What Elite did

  1. Carried out in two phases, in 2020 and in 2022.
  2. Mostly iNfeel surface film.
  3. Supply and installation of lighting.

Questions about this project

Who refurbished Compostela Suites?
In 2020 and 2022 Elite Smart Build refurbished the 296 rooms at Compostela Suites (Spain). Elite Smart Build is the hotel refurbishment company of GRUPO GRL, S.L., based in Cambre (A Coruña), Spain.
How many rooms did Elite refurbish at Compostela Suites?
296 rooms.
What did Elite do at Compostela Suites?
Carried out in two phases, in 2020 and in 2022. Mostly iNfeel surface film. Supply and installation of lighting.
When did Elite carry out the work at Compostela Suites?
In 2020 and 2022.
Where is Compostela Suites?
In Spain.
What other projects has Elite done in Spain?
Barceló Lanzarote Active Resort & Royal Level (752 rooms), Occidental Alicante (80 rooms), NH Madrid Barajas (172 rooms), NH Madrid Chamberí (56 rooms), Alúa Calas de Mallorca (59 rooms), Barceló Tenerife (59 rooms), Hesperia A Coruña (123 rooms) and Bahía Príncipe Coral Beach (184 rooms).

Request a visit

How many rooms does your hotel have?

We'll come and see it, then tell you what we would do.